Scrum Master
The Scrum Master tab reads the current sprint and shows what threatens it, with no model needed.

- Risk radar: scope churn since the sprint started, work in progress against the team’s limit, remaining work against capacity, blocked age, and unassigned or unestimated items.
- Items by state category and the sprint scope table with what was added, removed or moved.
- Impediments: blocked items with how long they have been blocked and who owns them.
- Retrospective facts: what finished, what carried over, where time went, as numbers you can bring to the retro.
- Stand-up brief: the same evidence as “Prepare today’s stand-up”, ready to read out.
Capacity comes from Azure Boards; when a team has no capacity set, that part stays unknown.