Sprints and stand-ups

Ask “Prepare today’s stand-up” or “How is the sprint going?”. StrideAI shows progress, story points, remaining work against capacity for each person, and what needs attention: blocked, idle, unassigned and unestimated items, plus everything done, moved or added since the last working day.

Stand-up report with progress, capacity per person, and items that need attention

  • “Who is over capacity this sprint?” — capacity and days off from Azure Boards.
  • “Move the unfinished items to the next sprint” — one approval card for the whole move.
  • “Create four two-week sprints for the Web Team starting January 4”.
  • “Unfinished items from the previous sprint” — a saved query if you want it.
  • “Run a fist of five on the Sprint 15 plan” — a confidence vote.

The Scrum Master tab in Quality & roles turns the same evidence into a sprint risk radar: scope churn, WIP, remaining work against capacity, blocked age, unassigned work, impediments, retrospective facts and a stand-up brief, with no model needed.

Scrum Master tab: sprint risk radar

Add the Sprint health widget to an Azure DevOps dashboard: the sprint’s progress, remaining work against capacity and what needs attention, recalculated with each viewer’s permissions. See Boards and dashboards.